load to cubic foot conversion

Conversion number between load and cubic foot [cu ft] is 50. This means, that load is bigger unit than cubic foot.

Contents [show] [hide]

Switch to reverse conversion:
from cubic foot to load conversion


Enter the number in load:

Decimal Fraction Exponential Expression
load
eg.: 10.12345 or 1.123e5

Result in cubic foot

?
precision [info]
Decimal:
Exponential:

Calculation process of conversion value


High precision conversion

If conversion between load to cubic-metre and cubic-metre to cubic foot is exactly definied, high precision conversion from load to cubic foot is enabled.

Decimal places: (0-800)

load
Result in cubic foot:
?
gads

load to cubic foot conversion chart

Start value: [load]
Step size [load]
How many lines? (max 100)

visual:
loadcubic foot
00
10500
201000
301500
402000
502500
603000
703500
804000
904500
1005000
1105500
Copy to Excel

Multiple conversion

Enter numbers in load and click convert button.
One number per line.

Converted numbers in cubic foot:
Click to select all

Details about load and cubic foot units:

Convert Load to other unit:

load

Definition of load unit: ≡ 50 cu ft. Load volume unit is equal to 50 cubic feet = 50 × 0.3048³ = 1.4158423296 m³

Convert Cubic foot to other unit:

cubic foot

Definition of cubic foot unit: ≡ 1 ft × 1 ft × 1 ft. ≡ 0.3048³ = 0.028316846592 m³


← Back to Volume units


© 2025 conversion.org Terms of use