cubic yard to load conversion

Conversion number between cubic yard [cu yd] and load is 0.54. This means, that cubic yard is smaller unit than load.

Contents [show] [hide]

Switch to reverse conversion:
from load to cubic yard conversion


Enter the number in cubic yard:

Decimal Fraction Exponential Expression
[cu yd]
eg.: 10.12345 or 1.123e5

Result in load

?
precision [info]
Decimal:
Exponential:

Calculation process of conversion value


High precision conversion

If conversion between cubic yard to cubic-metre and cubic-metre to load is exactly definied, high precision conversion from cubic yard to load is enabled.

Decimal places: (0-800)

cubic yard
Result in load:
?
gads

cubic yard to load conversion chart

Start value: [cubic yard]
Step size [cubic yard]
How many lines? (max 100)

visual:
cubic yardload
00
105.4
2010.8
3016.2
4021.6
5027
6032.4
7037.8
8043.2
9048.6
10054
11059.4
Copy to Excel

Multiple conversion

Enter numbers in cubic yard and click convert button.
One number per line.

Converted numbers in load:
Click to select all

Details about cubic yard and load units:

Convert Cubic yard to other unit:

cubic yard

Definition of cubic yard unit: ≡ 27 cu ft. ≡ 0.9144³ = 0.764554857984 m³ (1 yard = 0.9144 m)

Convert Load to other unit:

load

Definition of load unit: ≡ 50 cu ft. Load volume unit is equal to 50 cubic feet = 50 × 0.3048³ = 1.4158423296 m³


← Back to Volume units


© 2025 conversion.org Terms of use